MAKE YOUR VACANT PARKING SLOT EARN EXTRA INCOME
EV drivers need a place to charge. Your parking can be that place, and earn from it at the same time!
AddaVolt installs a charging station at your hotel, resort, restaurant or clinic at no cost to you, runs it, and pays you a share of every charging session, every month. The demand is already there: 87,500 EVs were sold in the Philippines this year and the whole country has 1,941 charging stations, one for every 45 new cars. The DOE's list of buildings that will have to install chargers is due this month.
About 87,500 EVs sold January to September 2026, hybrids included, against 1,941 EV charging stations nationwide. DOE Director Patrick Aquino, briefing of October 26, 2026, via Philippine News Agency, October 27.
BUILDING RULES
The law already reserves the parking. The charger list is due this month.
Section 17 of Republic Act 11697 requires every new private or public building with 20 or more parking slots to set aside at least 5% for electric vehicles, and bars local governments from issuing a building or renovation permit until that's done. Existing buildings follow the national roadmap's timeline.
Section 18 decides when those slots must carry chargers. On October 26 the DOE said it is finalising the list of public and private establishments that will have to install charging stations, with November 2026 as the target.
When it lands you'll have two choices: pay for the chargers yourself, or hand the slots to an operator who installs at no cost to the building and pays you a share of what the station earns.
RA 11697, April 15, 2022; Implementing Rules, September 2, 2022; DOE via Philippine News Agency, October 27, 2026.
HOW IT WORKS
You provide the slots and a power connection. AddaVolt does the rest.
01
Site check
We look at your parking, your power and your guests, and tell you what a station would do there. No contract at this stage.
02
Order, install, certify
AddaVolt orders the units, installs them, certifies the site with the DOE and trains your front desk. Units are ordered 30 to 45 days before they can be installed.
03
Drivers charge
A session runs through the AddaVolt app while the car's owner eats, shops, sleeps or works. The property never collects from drivers.
04
You get paid monthly
AddaVolt remits your share of Net Session Revenue every month, with the usage report.
Who pays the electricity
The station runs on the property's meter. AddaVolt meters every kWh, pays that electricity back to the property each month, and the share is calculated on what's left: Net Session Revenue is session revenue after electricity and payment fees. No equipment cost and no activation fee. The property doesn't buy equipment, file the DOE certification, collect from drivers, or call a technician. Five-year term. Source: AddaVolt host terms, November 2026.
OCTOBER 2026, FROM THE LEDGER
What the model looks like when it runs
157%
Revenue above the previous all-time record, 4x September
106
Paying users in October, against 39 in the best month before it
59%
Of revenue from drivers who came back
13
Earning stations in five provinces; 181 drivers joined in October with zero ad spend
Thirteen stations is a small base, and this page doesn't pretend otherwise. What a small base can prove is behaviour, and six in ten pesos coming from repeat drivers is the number that turns a plug into a reason to return. Source: AddaVolt operating ledger, October 2026 close, ledger-verified October 31.
Own parking? The next hardware order closes 30 to 45 days before installation.
Book a free site checkTHE NETWORK
Baguio, Pangasinan, Tarlac, Tagaytay, Laguna
Stations earn at hotels, resorts, a hospital and a provincial capitol, at places worth stopping. Every certified station has generated revenue. Deployment has compressed from more than five weeks to same-day activation.
Each new town makes the map more useful. A driver who can charge in Tarlac and again in Baguio plans the trip differently, and a property that sees the next town's station earning is easier to sign.
Want your town on this map? Book a site check
START THIS WEEK
Book a free site check
A site check is a visit. The contract comes later, if you want one. A site checked this month goes on the next hardware order; a site checked in February waits for the one after.
Prefer to talk first? Pick a 30-minute slot on the calendar, message +63-961-565-9289 with your property name, or fill up the form.
A person from AddaVolt answers every message. No autoresponder.
NOT A PROPERTY OWNER?
Three more doors. Each one is a single message.
Hosts book the site check above. If you run vehicles, follow this industry for a living, or want the numbers walked through live, pick your door.
FLEET
Fleet and corporate charging
Vehicles need a plug where they sleep and dependable charging on the routes they run. AddaVolt scopes depot charging at a site check and builds the public-network side around your routes. Public sessions are billed at ₱28.50 per kWh on AC (October 2026 price).
Email with the subject FLEETFOUNDER
A conversation with the founder
If you build in property, energy or mobility, or follow Philippine infrastructure for a living, Lou Beltran takes a small number of 30-minute conversations each month: how the network is being built, and the October ledger, station by station. A conversation about the build-out, with the numbers on the table.
Pick a 30-minute slotBRIEFING
The live briefing
Lou walks through the numbers in the 2027 Industry Briefing live and takes questions: the 45:1 gap, the November charger list, what October looked like on the ledger, and what 2027 brings.
Email with the subject BRIEFINGQUESTIONS HOSTS ASK
Before the site check
What does it cost me?
Nothing up front. No equipment cost and no activation fee. AddaVolt covers the hardware, installation, DOE certification and maintenance. You provide the parking slots and a power connection.
What do I earn?
A share of Net Session Revenue, remitted monthly with a usage report. Net Session Revenue is session revenue after electricity and payment fees. The exact share is set at the site check, based on the site.
Who pays the electricity?
The station runs on your meter. AddaVolt meters every kWh and pays that electricity back to you each month, before your share is calculated.
What does my site need?
A dedicated EV parking slot per charger (two recommended), a stable internet connection, and a power line to the slot. The site check confirms the wiring and breaker spec and any local permits.
How long is the term?
Five years from the DOE registration date. You can add chargers, higher-capacity units or DC fast charging later under a separate agreement.
Who fixes it when it breaks?
AddaVolt, at no cost to you. You never call a technician. Downtime, when it happens, comes from the grid or the telecom line, and the app shows drivers when a station is offline.
What about theft or damage?
AddaVolt provides security guidance (lighting, surveillance, barriers) and the property implements it. The site check covers this before anything is installed.
Do I have to do anything day to day?
No. Drivers find the station in the app, pay in the app and plug in themselves. AddaVolt watches the station remotely, handles support and sends your statement and remittance every month. Your front desk gets a short briefing at installation so they can point a guest to the bay.
AddaVolt Energy Corp is a BOI-registered enterprise headquartered in Baguio City and a DOE-accredited EVCS Provider across all three categories: Operator, Service, and Supplier. Station performance figures are measurements from AddaVolt's own ledger for the month stated; a station's earnings depend on EV traffic, session frequency and electricity rates and are not guaranteed.